Practice

a. Students will construct a rope bridge, cross it and retrieve it. PROVIDE HELP

a. The instructors will assist the students when necessary. OPPORTUNITY FOR QUESTIONS

A QUESTIONS FROM THE CLASS 1 QUESTIONS TO THE CLASS

Q What are the two criteria for site selection for one-rope bridge? A (1) Suitable anchors on both sides of the stream.

^^Good loading and unloading platforms. Q What are the two different methods used to cross a one-rope bridge? A. (1) Rappel-seat method. (2) Pulley method. SUMMARY

a. We have discussed the site selection, construction, crossing and retrieval of a one-rope bridge.

b Those of you with IRF's please fill them out at this time and turn them in to the instructor. We will now take a short break.

0 0

Post a comment